简体中文
curpage:Home>>News>>Lishui Today
Dushan Bridge Project in Songyang County Carried out Flood Prevention Emergency Drill

Date:2018-05-14 Source:Songyan County Government Office Author:

  

   In order to enhance the safety of flood prevention in flood season of the construction of Dushan Bridge project in Songyang county, to improve the coping capacity of the rescue team in extreme weather like flood and rainstorm, to make sure the personal and property safety of the project during the flood season, and cut the loss of the flood disaster, recently, the county organized over 50 rescuers in the construction unit and the supervision unit and over 10 rescuing machines to carry out the flood prevention emergency drill at the construction site.

  At 7AM, all participants assembled at the construction site of the bridge. According to the emergency plan, the teams assembled the rescuer squads, machinery and goods, and the general director announced the official start of the drill. Then, the Security Protection Team quickly delimited the safety warning area on the spot, monitored the warning information of water level elevation, velocity and every dangerous circumstance, and evacuates the personnel in dangerous areas; emergency commando team was divided into three teams to carry out rescue and relief work according to the situation on the spot. A team was organized to load sandbags, transport sandbags, reinforce and heighten the temporary cofferdams at risk. The second group rescued important materials and goods, organized the rescue machinery and transferred the square wood, the bamboo glue board, and the facility equipment to the safe area. The third team checked and transferred all the power distribution boxes in the cofferdams to a safe position above the warning water level, and added a water pump to pump out seepage and water in the cofferdams. After more than 3 hours of intensive and orderly rescue and relief work, more than 100 meters of dangerous overflowing cofferdam has been effectively controlled and all personnel, materials and equipment have been transferred to the safe area.   

  Through this drill, it has effectively improved the level of flood prevention of the rescue team on the construction site of Dushan Bridge, enhanced the quick response ability, achieved the expected purpose, and provided guarantee for the flood prevention in the flood season on the construction site of the bridge. (Shilijun, Songyang County Government Office)